Skip to main content

Change Order

Modifies an existing order.

Target: Spot and Margin trading

Endpoint​

POST /private/v1/changeOrder

Authentication​

This endpoint requires authentication with API-KEY, API-TIMESTAMP, and API-SIGN headers.

Request Parameters​

Parameter content type: application/json

ParameterTypeRequiredAvailable Values
orderIdnumberRequiredThe order ID to modify
pricestringRequiredNew price for the order
losscutPricestringOptionalNew losscut price (margin trading only)

Code Examples​

JavaScript (Node.js)​

const axios  = require('axios');
const crypto = require('crypto');

const apiKey = 'YOUR_API_KEY';
const secretKey = 'YOUR_SECRET_KEY';

const timestamp = Date.now().toString();
const method = 'POST';
const endPoint = 'https://api.coin.z.com/private';
const path = '/v1/changeOrder';
const reqBody = JSON.stringify({
orderId: 2,
price: "1201",
losscutPrice: "1000"
})

const text = timestamp + method + path + reqBody;
const sign = crypto.createHmac('sha256', secretKey).update(text).digest('hex');
const options = {
"headers": {
"API-KEY": apiKey,
"API-TIMESTAMP": timestamp,
"API-SIGN": sign
}
};

axios.post(endPoint + path, reqBody, options)
.then(function (response) {
console.log(JSON.stringify(response.data, null, 2));
})
.catch(function (error) {
console.log(error);
});

Python​

import requests
import json
import hmac
import hashlib
import time
from datetime import datetime

apiKey = 'YOUR_API_KEY'
secretKey = 'YOUR_SECRET_KEY'

timestamp = '{0}000'.format(int(time.mktime(datetime.now().timetuple())))
method = 'POST'
endPoint = 'https://api.coin.z.com/private'
path = '/v1/changeOrder'
reqBody = {
"orderId": 2,
"price": "1201",
"losscutPrice": "1000"
}

text = timestamp + method + path + json.dumps(reqBody)
sign = hmac.new(bytes(secretKey.encode('ascii')), bytes(text.encode('ascii')), hashlib.sha256).hexdigest()

headers = {
"API-KEY": apiKey,
"API-TIMESTAMP": timestamp,
"API-SIGN": sign
}

res = requests.post(endPoint + path, headers=headers, data=json.dumps(reqBody))
print (json.dumps(res.json(), indent=2))

Go​

package main

import (
"crypto/hmac"
"crypto/sha256"
"encoding/hex"
"fmt"
"io"
"net/http"
"strconv"
"strings"
"time"
"encoding/json"
"bytes"
)

func main() {
apiKey := "YOUR_API_KEY"
secretKey := "YOUR_SECRET_KEY"
timestamp := strconv.FormatInt(time.Now().UnixNano()/int64(time.Millisecond), 10)
method := "POST"
endPoint := "https://api.coin.z.com/private"
path := "/v1/changeOrder"
reqBody := (`{
"orderId": 2,
"price": "1201",
"losscutPrice": "1000"
}`)

text := timestamp + method + path + reqBody
hc := hmac.New(sha256.New, []byte(secretKey))
hc.Write([]byte(text))
sign := hex.EncodeToString(hc.Sum(nil))

client := &http.Client{}
req, _ := http.NewRequest(method, endPoint+path, strings.NewReader(reqBody))
req.Header.Set("API-KEY", apiKey)
req.Header.Set("API-TIMESTAMP", timestamp)
req.Header.Set("API-SIGN", sign)

res, _ := client.Do(req)
body, _ := io.ReadAll(res.Body)
var buf bytes.Buffer
json.Indent(&buf, body, "", " ")
fmt.Println(buf.String())
}

Ruby​

require 'net/http'
require 'json'
require 'openssl'
require 'base64'
require 'date'

apiKey = 'YOUR_API_KEY'
secretKey = 'YOUR_SECRET_KEY'

timestamp = DateTime.now.strftime('%Q')
method = 'POST'
endPoint = 'https://api.coin.z.com/private'
path = '/v1/changeOrder'
reqBody = {
:orderId => 2,
:price => '1201',
:losscutPrice => '1000'
}

text = timestamp + method + path + reqBody.to_json
sign = OpenSSL::HMAC.hexdigest(OpenSSL::Digest::SHA256.new, secretKey, text)

uri = URI.parse(endPoint + path)
req = Net::HTTP::Post.new(uri.to_s)

req['API-KEY'] = apiKey
req['API-TIMESTAMP'] = timestamp
req['API-SIGN'] = sign

req.body = reqBody.to_json

response = Net::HTTP.start(uri.host, uri.port, :use_ssl => uri.scheme == 'https') {|http|
http.request(req)
}
puts JSON.pretty_generate(JSON.parse(response.body), :indent=>' ')

Kotlin​

import org.json.JSONObject
import java.io.BufferedReader
import java.io.InputStreamReader
import java.net.HttpURLConnection
import java.net.URL
import java.util.*
import javax.crypto.Mac
import javax.crypto.spec.SecretKeySpec
import kotlin.experimental.and

fun main() {
var apiKey = "YOUR_API_KEY"
var secretKey = "YOUR_SECRET_KEY"
var timestamp = Calendar.getInstance().timeInMillis.toString()
var method = "POST"
var endPoint = "https://api.coin.z.com/private"
var path = "/v1/changeOrder"
var reqBody = """
{"orderId": 2, "price": "1201", "losscutPrice": "1000"}
"""

var text = timestamp + method + path + reqBody
var keySpec = SecretKeySpec(secretKey.toByteArray(), "HmacSHA256")
var mac = Mac.getInstance("HmacSHA256")
mac.init(keySpec)
var sign = mac.doFinal(text.toByteArray()).joinToString("") { String.format("%02x", it and 255.toByte()) }

var url = URL(endPoint + path)
var urlConnection = url.openConnection() as HttpURLConnection
urlConnection.requestMethod = method
urlConnection.addRequestProperty("API-KEY", apiKey)
urlConnection.addRequestProperty("API-TIMESTAMP", timestamp)
urlConnection.addRequestProperty("API-SIGN", sign)
urlConnection.doOutput = true
urlConnection.outputStream.write(reqBody.toByteArray())

BufferedReader(InputStreamReader(urlConnection.inputStream))
.readLines().forEach { line ->
println(JSONObject(line).toString(2))
}
}

PHP​

<?php

$apiKey = 'YOUR_API_KEY';
$secretKey = 'YOUR_SECRET_KEY';

$timestamp = time() . '000';
$method = 'POST';
$endPoint = 'https://api.coin.z.com/private';
$path = '/v1/changeOrder';
$reqBody = '{
orderId: 2,
price: "1201",
losscutPrice: "1000"
}';

$text = $timestamp . $method . $path . $reqBody;
$sign = hash_hmac('SHA256', $text, $secretKey);

$curl = curl_init($endPoint . $path);
curl_setopt($curl, CURLOPT_RETURNTRANSFER, true);
curl_setopt($curl, CURLOPT_POST, true);
$headers = array(
"Content-Type: application/json",
"API-KEY:" . $apiKey,
"API-TIMESTAMP:" . $timestamp,
"API-SIGN:" . $sign
);
curl_setopt($curl, CURLOPT_HTTPHEADER, $headers);
curl_setopt($curl, CURLOPT_POSTFIELDS, $reqBody);
$response = curl_exec($curl);
curl_close($curl);

$json_res = json_decode($response);
echo json_encode($json_res, JSON_UNESCAPED_UNICODE | JSON_PRETTY_PRINT);

Rust​

#![deny(warnings)]

extern crate reqwest;
extern crate time;
extern crate serde;
extern crate serde_json;
extern crate hex;
extern crate ring;

use std::time::{SystemTime, UNIX_EPOCH};
use serde_json::json;
use hex::encode as hex_encode;
use ring::hmac;

#[warn(unused_must_use)]
fn main() {
change_order().unwrap();
}

fn change_order() -> Result<(), Box<dyn std::error::Error>> {
let api_key = "YOUR_API_KEY";
let secret_key = "YOUR_SECRET_KEY";
let timestamp = get_timestamp();
let method = "POST";
let endpoint = "https://api.coin.z.com/private";
let path = "/v1/changeOrder";
let parameters = json!({
"orderId": 2,
"price": "1201",
"losscutPrice": "1000",
});

let text = format!("{}{}{}{}", timestamp, method, path, &parameters);
let signed_key = hmac::Key::new(hmac::HMAC_SHA256, secret_key.as_bytes());
let sign = hex_encode(hmac::sign(&signed_key, text.as_bytes()).as_ref());

let client = reqwest::blocking::Client::new();
let mut res = client.post(&(endpoint.to_string() + path))
.header("content-type", "application/json")
.header("API-KEY", api_key)
.header("API-TIMESTAMP", timestamp)
.header("API-SIGN", sign)
.json(&parameters)
.send()
.unwrap();
res.copy_to(&mut std::io::stdout())?;

Ok(())
}

fn get_timestamp() -> u64 {
let start = SystemTime::now();
let since_epoch = start.duration_since(UNIX_EPOCH).expect("Time went backwards", );

since_epoch.as_secs() * 1000 + since_epoch.subsec_nanos() as u64 / 1_000_000
}

Haskell​

{-# LANGUAGE OverloadedStrings #-}

{-# LANGUAGE QuasiQuotes #-}

module Main where

import Crypto.Hash.SHA256 as SHA256
import Data.Aeson (encode)
import Data.Aeson (Value)
import Data.Aeson.Encode.Pretty
import qualified Data.Aeson.QQ as Aeson.QQ
import qualified Data.ByteString as B
import qualified Data.ByteString.Base16 as B16
import qualified Data.ByteString.Char8 as BS
import qualified Data.ByteString.Lazy.Char8 as S8
import Data.Monoid ((<>))
import qualified Data.String as S
import Data.Time.Clock.POSIX (getPOSIXTime)
import Network.HTTP.Simple

apiKey :: B.ByteString
apiKey = "YOUR_API_KEY"

secretKey :: B.ByteString
secretKey = "YOUR_SECRET_KEY"

method :: B.ByteString
method = "POST"

endPoint :: S.String
endPoint = "https://api.coin.z.com/private"

path :: S.String
path = "/v1/changeOrder"

main :: IO ()
main = do
posixTime <- getPOSIXTime
let epochTime = BS.pack . show . round $ posixTime
let timestamp = epochTime <> "000"
let requestBodyJson =
[Aeson.QQ.aesonQQ| {
"orderId": 2,
"price": "1201",
"losscutPrice": "1000" }
|]
let requestBodyBS = S8.toStrict $ encode requestBodyJson
let sign = B16.encode $ SHA256.hmac secretKey (timestamp <> method <> BS.pack path <> requestBodyBS)
let url = endPoint <> path

request' <- parseRequest url
let request
= setRequestMethod "POST"
$ setRequestSecure True
$ setRequestPort 443
$ setRequestHeader "API-KEY" [apiKey]
$ setRequestHeader "API-TIMESTAMP" [timestamp]
$ setRequestHeader "API-SIGN" [sign]
$ setRequestBodyJSON requestBodyJson
$ request'
response <- httpJSON request
S8.putStrLn $ encodePretty (getResponseBody response :: Value)

C#​

using System;
using System.Net.Http;
using System.Net.Http.Headers;
using System.Security.Cryptography;
using System.Text;
using System.Threading.Tasks;

class Example
{
static readonly HttpClient HttpClient = new HttpClient();

public static void Main(string[] args)
{
var task = ChangeOrder();
task.Wait();
Console.WriteLine(task.Result);
}

static async Task<String> ChangeOrder()
{
const string apiKey = "YOUR_API_KEY";
const string secretKey = "YOUR_SECRET_KEY";

var timestamp = ((long) (DateTime.UtcNow - new DateTime(1970, 1, 1)).TotalSeconds).ToString() + "000";
const string method = "POST";
const string endpoint = "https://api.coin.z.com/private";
const string path = "/v1/changeOrder";
var reqBody = "{ \"orderId\": 2, " +
"\"price\": \"1201\", " +
"\"losscutPrice\": \"1000\"}";

using (var request = new HttpRequestMessage(new HttpMethod(method), endpoint + path))
using (var content = new StringContent(reqBody))
{
var text = timestamp + method + path + reqBody;
var hmacsha256 = new HMACSHA256(Encoding.UTF8.GetBytes(secretKey));
var hash = hmacsha256.ComputeHash(Encoding.UTF8.GetBytes(text));
var sign = ToHexString(hash);

content.Headers.ContentType = new MediaTypeHeaderValue("application/json");
request.Content = content;
request.Headers.Add("API-KEY", apiKey);
request.Headers.Add("API-TIMESTAMP", timestamp);
request.Headers.Add("API-SIGN", sign);

var response = await HttpClient.SendAsync(request);
return await response.Content.ReadAsStringAsync();
}
}

static string ToHexString(byte[] bytes)
{
var sb = new StringBuilder(bytes.Length * 2);
foreach (var b in bytes)
{
sb.Append(b.ToString("x2"));
}

return sb.ToString();
}
}

Swift​

import Foundation
import CommonCrypto

extension Data {
var prettyPrintedJSONString: NSString? {
guard let object = try? JSONSerialization.jsonObject(with: self, options: []),
let data = try? JSONSerialization.data(withJSONObject: object, options: [.prettyPrinted]),
let prettyPrintedString = NSString(data: data, encoding: String.Encoding.utf8.rawValue) else { return nil }
return prettyPrintedString
}
}

extension String {
func hmac(secretKey: String) -> String {
let text = self.cString(using: String.Encoding.utf8)
let textLen = Int(self.lengthOfBytes(using: String.Encoding.utf8))
let digestLen = Int(CC_SHA256_DIGEST_LENGTH)
let result = UnsafeMutablePointer<CUnsignedChar>.allocate(capacity: digestLen)
let secretKeyStr = secretKey.cString(using: String.Encoding.utf8)
let secretKeyLen = Int(secretKey.lengthOfBytes(using: String.Encoding.utf8))

CCHmac(CCHmacAlgorithm(kCCHmacAlgSHA256), secretKeyStr!, secretKeyLen, text!, textLen, result)
let digest = stringFromResult(result: result, length: digestLen)
result.deallocate()
return digest
}

private func stringFromResult(result: UnsafeMutablePointer<CUnsignedChar>, length: Int) -> String {
let hash = NSMutableString()
for i in 0..<length {
hash.appendFormat("%02x", result[i])
}
return String(hash)
}
}

let dispatchGroup = DispatchGroup()
dispatchGroup.enter()

let apiKey = "YOUR_API_KEY"
let secretKey = "YOUR_SECRET_KEY"
let timestamp = String(Int64((Date().timeIntervalSince1970 * 1000.0).rounded()))
let method = "POST"
let endPoint : String = "https://api.coin.z.com/private"
let path : String = "/v1/changeOrder"
let reqBodyStr = """
{
"orderId": 2,
"price": "1201",
"losscutPrice": "1000"
}
"""
let reqBodyData = reqBodyStr.data(using: .utf8)!

let text = timestamp + method + path + reqBodyStr
let sign = text.hmac(secretKey: secretKey)

var request = URLRequest(url: URL(string: endPoint + path)!)
request.httpMethod = method
request.httpBody = reqBodyData

request.setValue(apiKey, forHTTPHeaderField: "API-KEY")
request.setValue(timestamp, forHTTPHeaderField: "API-TIMESTAMP")
request.setValue(sign, forHTTPHeaderField: "API-SIGN")

let task = URLSession.shared.dataTask(with: request, completionHandler: { data, response, error in
print(data!.prettyPrintedJSONString!)
dispatchGroup.leave()
})
task.resume()

dispatchGroup.notify(queue: .main) {
exit(EXIT_SUCCESS)
}
dispatchMain()

Response Example​

{
"status": 0,
"responsetime": "2019-03-19T01:07:24.557Z"
}

Changes an order.Target: Spot and Margin trading##### Request

POST /private/v1/changeOrder##### Parameters

  • Parameter content type:application/json
    ParameterTypeRequiredAvailable Values
    orderIdnumberRequired
    pricestringRequired
    losscutPricestringOptional